Bicycle storage De Entree Amsterdam

Bolidt & MAX BÖGL

Much has been said about it, the metamorphosis of Dé Entree to Amsterdam.
Under the Open Harbour Front, a bicycle shelter with space for over 7,000 bicycles has been realized. Unique, because it was built underwater.

Maarten Struijs, Max Bögl project manager talking about the choice of the Bolidt floor finishing system. The choice of texture is based on usage and designed to prevent cyclists from slipping, thus safety is optimized.
The bicycle shelter is fitted with the Boligrip® 50R, is a vapour-open floor finishing system , excellent for an underground cycle shed.

Boligrip® 50 series
Boligrip® 50R
Boligrip® 50P

Ask a question


Latest news & inspiration

Get inspired, read about the latest innovations and keep your creativity up to date.

BOLIDT BOOSTER

CONTACT INFORMATION

Bolidt Synthetic Products & Systems

Driving route planner

Mailing address

P.O. Box 131
3340 AC Hendrik-Ido-Ambacht
The Netherlands

Visitor address

Bolidt Innovation Center
Noordeinde 2
Hendrik-Ido-Ambacht
3341 LW The Netherlands

TEL +31 (0)78 684 54 44
EMAIL website@bolidt.nl